Energy infrastructure liaison records, 2023–2024
This page preserves records of energy-infrastructure stakeholder meetings in 2023 and 2024, together with maps circulated during that period. The maps show proposals recorded at the time and should not be used to establish current development boundaries, cable routes or consent status.
For current project information and useful links, visit Energy projects. For applications considered by ELCC, including its recorded positions and representations, visit Planning applications considered by ELCC.
East Lammermuir Energy Projects Stakeholder Meeting 26 February 2024
Over 140 people came along to the public meeting held in Innerwick Village Hall on 26 February 2024.
The meeting introduced a website bringing together information about energy projects and infrastructure developments in the area. Visit the East Lammermuir Developments website for its project information, map and document library.
East Lammermuir Energy Projects Stakeholder Meeting 7 December 2023
The Community Council co-led this meeting with East Lothian Council. This was the third time all known electricity infrastructure developers had come together to talk with us about how they intend to progress their proposals. Twelve community members attended – one each from the settlements which will be most affected by the proposed developments. The subsequent public meeting took place on 26 February 2024, recorded above.
Draft meeting note — 7 December 2023 (PDF)
East Lammermuir Energy Projects Stakeholder Meeting 25 October 2023
The Community Council co-led this meeting with East Lothian Council. This was the second time all known electricity infrastructure developers had come together to talk with us about how they intend to progress their proposals. Twelve community members attended – one each from the settlements which will be most affected by the proposed developments. A subsequent meeting took place on 7 December 2023, recorded above.
Stakeholder meeting feedback and notes — 25 October 2023 (PDF)
These maps were circulated with the 2023 updates and are retained as historical records. For current project information, follow the Energy projects link above.

Combined maps showing proposed developments
Combined proposed developments map — historical record linked in 2023 (PDF)
This archived map shows indicative cable routes for developments described at the time as planned to connect to the proposed Branxton Substation. The linked file is described as draft and for information only. It does not establish current routes or consent status.

Branxton indicative cable routes — draft, for information only (PDF)
Infrastructure event — 25 April 2023 (archived event page and presentation)
Contact details and the feedback invitation on that archived page date from the event.
Archived ELCC planning submissions, 2023–2024
Branxton substation and temporary haul road
Branxton Battery Energy Storage System
Berwick Bank Wind Farm onshore works
Neart na Gaoithe – Innerwick Residents Forum, 2020
The Neart na Gaoithe project team met with Innerwick residents to discuss the onshore cable route, substation works and traffic. The August records summarise progress and upcoming works. The September and October minutes also record attendees and actions.
Innerwick Residents Forum – 4 August 2020 (PDF)
Innerwick Residents Forum – 18 August 2020 (PDF)
Innerwick Residents Forum – 29 September 2020 (PDF)
Innerwick Residents Forum – 27 October 2020 (PDF)
Blackcastle Hill community turbine, 2012–2013
Dunbar Community Energy Company applied in November 2012 for a 500 kW community-owned wind turbine at Blackcastle Hill, south of Innerwick (planning reference 12/00874/P). The company proposed using profits for community projects in the Dunbar and East Linton ward.
ELCC sent a questionnaire to 350 households in the Spott, Innerwick and Oldhamstocks area. The 115 returned questionnaires recorded the views of 215 adults: 118 opposed the proposal, 69 supported it and 28 expressed neither support nor opposition.
ELCC objected on grounds including visual and landscape impact, noise and consistency with local planning guidance. East Lothian Council’s Planning Committee unanimously refused permission on 7 May 2013. The applicant appealed, and ELCC reiterated its objection. On 4 November 2013 ELCC reported that the Scottish Government Reporter had dismissed the appeal.
Two documents referenced in ELCC’s original account are missing from the archive: the Blackcastle Hill wind turbine questionnaire and ELCC’s objection letter. The survey figures and grounds for objection above come from ELCC’s published account.