Active Travel update
Following on from the Active Travel workshop in November, the Walk Wheel Cycle Trust are currently undertaking a Feasibility Study looking at potential crossing locations of the A1 in East Lammermuir. They have provided this update:
The team have been on site recently and our engineering colleagues are currently exploring options at four locations and the infrastructure that these would require. We are also looking into the infrastructure that would be required to allow connectivity into the National Cycle Network (NCN) and the local road network as part of this.
Trust ecologists are due on site within the coming weeks to conduct a Preliminary Ecological Survey which will help guide the options available to us.
We are also in discussions with Energy Companies, East Lothian Council, East Lothian Climate Hub and other organisations with an interest in the area to pursue any possible collaboration between ongoing projects.