Historical records — 2011

Historical material from the former ELCC website. These records describe the position at the time. Events, advice, contacts and funding information may no longer apply. For current information, visit the Community Council page.

Back to historical records and documents

Choose a record below to read its original text. Dates shown are original publication dates.

Minutes of Meeting, 12 October 2011 — 2011-10-17
Draft

MINUTES OF MEETING OF

EAST LAMMERMUIR COMMUNITY COUNCIL

held on Wednesday 12 October, 2011 in

Stenton Village Hall

 Present:                      Cllrs D Charlton (Vice Chair)/B Wyllie/M Ramsay/P Swain/P Armstrong/M Mylne/J Hanvidge

 In attendance:           Pauline Jaffray  Apologies:                  Cllr C Bruce  The Councillors of East Lammermuir Community Council held a closed meeting, prior to the main ELCC meeting to discuss the management of Crystal Rig Windfarm funds.  Cllrs Bruce, Hanvidge & Wyllie had previously met as a sub committee to discuss this issue and JH put forward their suggestions.  At this meeting Councillors were informed rumour had it a number of groups and individuals have been appointed to manage the funds.  This is not the case and Councillors felt strongly the overall management of the funds should be maintained by ELCC in line with the Minute of Agreement.  The first priority is not to be rushed into making a decision too quickly.  A workshop is to be held on Sunday 20 November from 1pm-4pm at Ruchlaw Mains at which ELCC will develop a set of principles using an independent facilitator.  It is important ELCC should get the principles right first, before discussing the proposals for how ELCC manage and/or distribute the money.  The facilitator has experience in this type of project and will be responsible for engaging with councillors to ensure all opinions, thoughts and ideas are taken into consideration.  Councillors have been asked to give this some thought prior to the workshop and put forward as many ideas as possible on the day. The second priority is for ELCC to maintain overall control of the Crystal Rig Community Benefit Fund and appoint specialist help when and if needed.  ELCC do have experience, together with a good working relationship with Crystal Rig, in operating the funding to date and we are fortunate to have in place Councillors with professional experience and training.  Cllr Swain put forward to the meeting suggestions from Sustaining Dunbar on how part of the funding could be used to assist individuals in the East Lammermuir area on energy efficiency schemes and how a possible loan scheme could be adopted.  Unfortunately, this is not possible as the Crystal Rig funding is to help organisations, not individuals.  Current applications:  Currently there are two applications outstanding who have requested funding. Spott Church require match funding and Spott WRI, whose application was not received until August, 2011 are seeking funding for their 90th birthday celebrations.  The discussion was suspended due to members of the public arriving for the ELCC meeting and information regarding these two applications would be circulated to councillors.  Vice Chair, Dawn Charlton drew the meeting to a close and welcomed all those present to the East Lammermuir Community Council Meeting.   Present       Cllrs D Charlton (Vice Chair)/B Wyllie/M Ramsay/P Swain/P Armstrong/M Mylne/J Hanvidge  In attendance:           Pauline Jaffray/Cllr J Bell/PC Gavin Ross and two members of the public  1:00  Apologies:         Cllr C Bruce/Cllr Wyllie  Prior to the meeting commencing and to introduce PC Gavin Ross all those present introduced themselves.  2:00  Approval of minutes of meeting held on 30 August, 2011.  The minutes were approved by Cllr Mylne, seconded by Cllr Swain subject to the following amendment.  Spott:   The visibility from the exit to the driveway at Easter Broomhouse is being blocked by the mound and to rectify the problem the mound needs to be pared.  3:00     Any other business to be added to agenda.  Consultation on supplementary Landscape Capacity Study for Smaller Wind Turbines  4:00     Police Business  PC Gavin Ross who is based at Dunbar Police Station is the community police representative for the East Lammermuir area.  He is also the wildlife crime office for East Lothian.  PC Ross advised of the increase in rural crime.  Theft of scrap metal, heating oil, fuel etc and for us to be more vigilant in locking our vehicles, houses, outhouses etc.  Operation Ether commences on Saturday 16 October, 2011 when police will have a presence in the East Lammermuir villages and introduce and meet local residents.  Advice on anti social behaviour, security etc will be provided.  Four incidents were brought to the meeting’s attention.  A number of complaints have been received, re excessive mud on rural roads.  Farmers have been notified to clean up asap.  A postman has been badly bitten by a dog in Spott.  VOSA stopped a lorry at Dunglass.  The occupants – a male and female ran off and it was subsequently found that the vehicle had been stolen.  Despite a thorough search the driver and accomplice were not found.  Between 17 and 19 September a field of sheep at a Thorntonloch holding had been badly worried by what is thought to be a number of children.  This is a very distressing incident as one lamb had had its fleece torn out by hand and a further lamb had died due to the stress.  Cllr Swain provided PC Ross with a copy of the ELCC Newsletter, which subject to his approval, could include any police matters.  Cllr Swain would email PC Ross a copy of the next newsletter, prior to publication, seeking approval for any police items to be included.  5:00     Treasurer’s Report:  The balance as of 12 October stands at £905.42, which takes in to account unpresented cheques totalling £885.  6:00     Matters Arising (Previous)                                                                                                    Action  Wester Dodd Wind farm – Akengall2:  The reporter has requested further information pending a decision as to whether he needs to re-convene the session or can make a judgement on evidence presented to him.  Since ELCC last met, the MOD have withdrawn their objection, Scottish Natural Heritage have significantly strengthened their statement to make clear they think the proposal is unacceptable and as far as known, Community Windpower has not re-submitted noise data.  No decision has been reached as yet.  Ferneylea Wind farm application:  No further information  Blackburn Wind farm application:  No further information  Mainstream RP.  Offshore wind proposals:  will provide a presentation at the start of our next meeting on Tuesday 29 November at 7.30pm.  A maximum of 15 minutes has been allocated for the presentation, with 10 minutes for questions.  Lafarge Wind turbines:  No progress  BeGreen, Dunbar & District:  Cllr Swain, a founder director of BeGreen advised BeGreen has been set up as a Community Interest Company limited by Guarantee and Cllr Swain would forward detailed notes to all ELC Councillors.                                                                                                                                         PS  Liaison Meetings:       No reports  Belhaven Hospital Forum:  Cllr Mylne apologised as he had not been able to attend the meeting on 21 September.  He had also not received any information.  Cllr Mylne would attend the next meeting at Hallhill on 25 October at 6.30pm.  The public meeting organised for 1 November had been cancelled.  PJ confirmed this with Wendy Michael (0131 536 8010) on 13 October, 2011.  Lafarge:  The fire service who attended the Lafarge fire had advised all local residents keep their windows and doors closed.  This information had not reached local residents and ELCC want to know why.  Cllrs PA and BW to raise at next meeting:                                                                                                 PA&BW  Oldhamstocks:  Cllr JB has notified Tom Shearer of the request for grass cuttings to be uplifted from village greens, particular at times of flower shows and fetes.  Innerwick:  The potholes in Smiddy Row have been repaired and the inspection cover has been replaced.  First Bus:    The unreliability of First Bus services is still of concern.  The 253 service has been discontinued.  Spott:    Cllr JB has reported the speeding concerns at Easter Broomhouse, but will also report these concerns at the police meeting to be held next week.  The poor visibility due to the mound has also been reported.                                                                                                                                                   JB  Stenton:  Cllr JB has reported the condition of the road at the East Linton T junction.  Village Lighting:  Cllr PS had publicised the suggestion of reducing street lighting in the villages via the newsletter and had received two objections and Cllr JH had also received a further objection.  Further discussion took place and Ettie Spencer emphasised the importance of energy conservation.  Perhaps the following compromises could be considered.  Switch off street lights at midnight.  Reduce wattage.  Reduce lamp posts. Only switch on alternate lamp posts.  ELCC agreed to take this matter back to each village to discuss with other groups/organisations.                       ELCC  LEAP – Plans for an environmental project:  Councillors were reminded each village has to identify an environmental project which is to be submitted to ELC by 20 October.  Innerwick have identified the need for a handrail and Stenton the on going programme at The Butts.                                                                      ELCC  7:00     Councillors’ Reports  Spott:   Cllr MM reiterated the concerns regarding speeding past Easter Broomhouse and the poor visibility due to the mound.                                                                                                                                          JB  The road from Spott roundabout to the village requires complete resurfacing and loose gravel has already caused one bad bike accident.                                                                                                                        JB  Innerwick:  Cllr DC reported her car has been vandalised (scratch both sides) as have another five. Three in Main Street and three in Kirk Brae.  Incident reported to police.  Main Street and Smiddie row potholes have been repaired.  Further concerns have been raised with regards to the proposed sewage plant at Thurston Manor.  Cllr DC to speak with other residents.                                                                                                               DC  Stenton:  The repairs to the village green road have been completed, however, the special parking area on the village green has not.  The handle on the gate near the Tron is broken and Cllr JB to report.                                                                                                                                                                                             JB  The playpark is going ahead and Cllr MR to ascertain the costs and how much ELCC have committed.     MR Planning Permission:   The Glebe Barn, Stenton – installation of doors. Newsletter:     Forthcoming events to be notified to Cllr PS.  Stenton Community Association AGM – 18 November at 7.30pm Consultative Draft Supplementary Landscape Capacity for Smaller Wind Turbines This document appears to be very significant and Cllr CB recommends ELCC support it and for ELCC to view and submit their views by 20 October.  One point Cllr CB highlights is the ‘tubular’ style of turbine (a photo of which is in the appendix) as it moves less obviously.  Please view this document and comment accordingly.                                                                                                                                                         ELCC  8:00  Correspondence  – None  9:00     Date of Next Meeting:  29 November, 2011, Spott Village Hall – 7.30pm                                                    17 January, 2012, Oldhamstocks Village Hall – 7.30pm
First Group to end trial service — 2011-09-13

We understand that First Group are to discontinue their route 253 Edinburgh – Berwick-upon-Tweed service on 30 September 2011.  The service was introduced for a ‘trial period’, and has been plagued by breakdowns and poor timekeeping.

Crowhill, Innerwick and Thurston will continue to be served by the 2-hourly service provided by Perrymans, which will continue as before.

Minutes of meeting, 30 August 2011 — 2011-09-07

MINUTES OF MEETING OF

EAST LAMMERMUIR COMMUNITY COUNCIL

held on Tuesday, 30 August, 2011 in

INNERWICK VILLAGE HALL

 

 

Present:          Cllrs C Bruce (Chair)/D Charlton/M Mylne/P Swain/B Wyllie   In attendance:  Cllrs J Bell/P McLennan (part of the time)/Pauline Jaffray   1:00     Apologies:      Cllrs J Hanvidge/P Armstrong/M Ramsay   2:00     Approval of minutes of meeting held on 28 June, 2011.  The minutes were approved subject to the following amendments.   Cllr Mylne apologised for not notifying his apologies for this meeting.  It was also noted Cllr K Tulloch, Cockburnspath & Cove Community Council was in attendance at the meeting held on 28 June, 2011.   Cllr Bruce suggested subheadings for the first two paragraphs on the minutes – Wind farms and Hoprigshiels would make for easier understanding. Also insert at the end of paragraph two the following:  Cllr Tulloch advised that for their part the Co’path & Cove Community Council will hold a meeting in Cockburnspath on Tuesday 5 July at 7pm to consider the Hoprigshiels proposal.   Matters Arising:   Item1:   Subheading ‘Wester Dodd Wind farm – Public Inquiry’                               Item 4:  The 30mph signage at Oldhamstocks is not done.                              Item 8:  Amend Cllr Swain to read Armstrong   3:00     Any other business to be added to agenda:                                                           Action               Viridor Liaison Meeting             Landfill Tax Credits – Future Balance             Belhaven Hospital Forum             Lafarge             Dunbar & District Community Planning             Blackburn Wind farm application             Ferneylea Wind farm application   4:00     Police Business – No representation or report presented.  However, it was noted PC Cameron Tait would be leaving his post at Dunbar and PC Gavin Ross, who also holds the post of Wildlife Officer will be the appointed representative on ELCC from October, 2011   Cllr Swain would like to include relevant police matters in the newsletter, subject to approval.                                                                                                    Action   It was noted all fuel should be adequately secured as due to the high costs of fuel, a number of thefts had occurred elsewhere in the county.   5:00     Treasurer’s Report   In her absence Cllr Hanvidge has circulated to each member a report of ELCC financial status.  The bank balance still stands at £1,838.39. All cheques from Crystal Rig Awards have been sent out and receipts are being received for expenditure incurred.  There is a shortfall in the funding for Spott Church and this needs to be discussed as per Cllr Hanvidge’s proposal emailed to all councillors on 23/8/11.   Cllr Hanvidge asked if councillors could allocate 30 minutes prior to our next meeting to discuss specific issues regarding admin/management of the increased funds being allocated to ELCC.  It is important ELCC remain in control of this funding and seek additional support when required.   Cllr Bruce suggested ELC councillors identify a set of guiding principles for managing this increased funding and Cllrs Wyllie, Hanvidge and Bruce to meet to consider how best to achieve agreement on these.                                                                                     CB   6:00     Matters Arising   Wester Dodd Wind farm – Akengall 2:  Cllr Bruce advised a Reporter had held a site visit in Oldhamstocks, a conservation area, to consider the visual impact this development would have.  A visualisation impact study from the Cockit Hat Strip, clearly depicts the obvious visual impact this proposed development would have.  Additionally, three of the proposed turbines would be visible from the Oldhamstocks village green and a further four/five turbines will become visible if the commercial woodland is cut down.  The cumulative noise from all the nearby wind farms would also have a detrimental effect on the village. The Reporter has requested that new noise data should be made available and will be circulated and comments invited.  Ferneylea Wind farm application:   Has been submitted, together with additional information on fuel poverty deprivation.  Further visuals have been requested. Blackburn Wind farm application:  A planning application for 126m turbines has been submitted and again these would be visible from Oldhamstocks.  Again the cumulative impact, similar to the Hoprigshiels development is of concern.  ELCC would write a letter of objection to Scottish Borders Council.                                                                               CB  Mainstream  RP, the company in connection with the ‘Offshore’wind proposals, Neart na Gaoithe, who are currently surveying the best route for cabling,  would like to hold an open meeting on November 29, when ELCC are holding their meeting in Spott.  The meeting agreed.  Lafarge Wind turbines:           No progress  Newsletter:  Due to the space restrictions, Cllr Swain suggested we reduce the font size.                                                                                                                                  PS BeGreen, Dunbar & District:  Cllr Swain advised he had attended the BeGreen meeting which is now a Community Interest Company Limited by Guarantee. They have suggested ELCC might like to make funds available from the Crystal Rig monies for a revolving loan fund for energy saving benefits to inhabitants in the ELCC area. The meeting asked Cllr Swain to obtain from BeGreen a clear, written statement of their organization, how it is funded and their relationship/connection to Sustaining Dunbar and other local groups etc.                                                                      PS  Liaison Meetings:  Viridor held on 10 August, 2011.  No SEPA representative in attendance.  Viridor at the end of July received from SEPA a permit to operate Energy from Waste for combined heat and power plant.  Viridor are aiming to commence construction at the end of this year, beginning of 2012, which will take three years to construct.  However, the business case is not yet ready and Cllr MacLennan confirmed that no heat plan has yet been submitted for consideration by East Lothian Council and without this the plant cannot proceed.  SEPA, after carrying out a number of inspections, have awarded Viridor a certificate of excellence for their inspection performance, which may result in the number of inspections carried out by SEPA being reduced.  Landfill Tax Credits – Future Balance:  There is an increase in funding requests and more applications are being received,  then there are monies for.  However, all requests are being considered.  Belhaven Hospital Forum:  Cllr Wyllie had attended this meeting, which had been an introductory meeting and background detail had been provided.  There is to be a public meeting on 1 November, 2011 and dates were arranged for future meeting. Cllr Mylne would represent ELCC at all future meetings the next being 21 September, at 6.30pm in Hallhill Healthy Living Centre.                                                                          MM  Lafarge:  Meeting held on 24 August, 2011 advising of the third sustainable fuel PSP. A public exhibition will be held in Innerwick on 8 October, 2011.  The stone from East Barns farm is being used to repair a dry stone wall in Woodhall Dene.  The access road to the quarry is now complete, as is the new cycle pathway.  An application to close the road from East Barns to Skateraw is being lodged with ELC.  7:00     Councillors’ reports:  Oldhamstocks:  The Oldhamstocks Bridge hass being repaired.  The 30mph signs to be moved by end of September, 2011.  The flood management scheme appears to be working effectively.  Can grass cuttings be uplifted especially around the time of flower shows and other local events?  This applies to all villages.  Tom Shearer to be advised.                                                                                                    JB  Innerwick:  A local farmer had inadvertently cracked an asbestos water pipe, which had caused alarm.  Scottish Water has checked the area and everything is in order.  Pot holes in Smiddy Row are severe and require attention.                                                  JB  A number of complaints have been received with regard to the unreliability of the FirstBus bus service and the very poor customer care.  Cllr Swain had advised FirstBus and the situation had improved. However, the bus service is unreliable and Cllr Bell would forward complaint on to FirstBus.                                                          JB  Cllr Charlton advised a bike had been vandalised whilst left in the bus stop area.  An inspection pit cover, located in a grass verge, is missing and is very dangerous. Cllr Swain has advised Scottish Water who have placed a cone, but this is only a temporary measure.  Cllr McLennan would raise with SW at a meeting due to be held on 31 August, 2011.                                                                                                       PMcL  Innerwick visiting postal service is still available and it was suggested this be advertised in the newsletter.  Newsletter to be added to agenda.                                        PS  The cattle grid at the top of Elmscleugh has been replaced and the road is now open. However, the bottom of the road near to the farm is in a very bad condition.  Cllr Charlton advised a local resident has expressed concern re the proposed sewage treatment plant at Thurston Holiday Park.  No further details were available  Spott:  Cllr Mylne expressed thanks and gratitude to ELC for the tarmacadam of cycle path at Easter Broomhouse.  Very much appreciated.  Speeding is of concern past Easter Broomhouse Cottages and Scottish Water have carried out repairs removing road markings and signs, which need to be replaced.   The visibility from the mound at Easter Broomhouse is very poor and to rectify this problem the mound needs to be pared.  Cllr Bell will report.                            JB  Stenton: Cllr Bell reported Bear have replaced the dropped kerb at Thistly Cross. Cllr Wyllie advised the road is badly breaking up at the East Linton T junction.                  JB The Dry March road is closed for safety due to the wall collapsing and Cllr Wyllie advised Dunpender Community Council is dealing with this.  Cllr Swain brought to the attention of the meeting an email from Ettie Spence sent on 8 August, 2011 suggesting the switching off of street lights in villages to help combat light emissions.  A new area of funding for village halls is available from SCVO.  8:00     Correspondence  Community Windpower open day on 17 September, 2011 from 10am-3pm Community Planning – Volunteers Event, Hallhill on 2 September 7-9pm  –  Transport & Housing strategy, West Barns Hall, 23 September, 7.30pm RAGES AGM – West Barns Bowling Club, 14 September at 7.30pm Future use of old library building. LEAP – Plans for an environmental project throughout East Lothian is taking place on 29 February, 2012.  Aim – overall improvement of environment.  ELCC to identify a range of projects by 28 October, 2011. Cllr Bruce to seek electronic copy of relevant documentation to circulate to members.  9:00     Date of Next Meeting – 12 October, 2011. Stenton Village Hall
Hoprigshiels windfarm proposal — 2011-08-09

On 6 July, I reported that the recent meeting of the community council had heard concerns from residents in and around Oldhamstocks about a proposal by Berwickshire Housing Association to build a windfarm at Hoprigshiels.  Chairman Chris Bruce had arranged a limited opinion survey that had produced inconclusive results.  Several local residents offered to assist in carrying out a more extensive survey, and I can now report the results of this.  A survey form was distributed locally and people were invited to complete and return the form, indicating their views.

The numbers of indivdual respondents expressing opinions were:-

Strongly opposed                        60

Tend to oppose                             3

Neither support nor oppose     15

Tend to support                           8

Strongly support                        24

This majority of respondents tending to oppose or strongly opposing has now been reflected in a letter sent by the Chairman on behalf of the community council to the Planning Department of Scottish Borders Council expressing, on behalf of the local community, our opposition to this proposal.

New newsletter — 2011-07-26

The second issue of our newsletter is currently (26 July) being distributed.  This brings news from the Community Council meeting held on June 28th.  Its production has unfortunately been delayed because of holidays, not least those of the printers.  We hope that the next issue – due to follow the next meeting on 30 August in Innerwick Village Hall – will be unaffected by holidays and will appear more promptly.

Innerwick Flower Show – 6 August 2011 — 2011-07-26
The following press release has been issued, with details of this year’s flower show:- A GREAT DAY OUT FOR THE WHOLE FAMILY: INNERWICK FLOWER SHOW   One of the most popular dates in the event calendar is the Innerwick Flower Show when family and friends enjoy the many delights of the oldest flower show in the county.   It may be tempting fate, but the weather is almost always kind on Innerwick’s all important date – Saturday, 6 August.  This is the date for your diary – the 138th  Innerwick Flower, Vegetable & Fruit Show.    The warm spring weather and the summer showers have made it a difficult year for gardeners, but nonetheless the flowers, fruit and vegetables are still growing well and organisers and competitors alike are busy preparing for this well-established and extremely popular Flower Show.   Innerwick, just off the A1 south of Dunbar, will be decked in its finest, ready to welcome locals and visitors alike. The doors open at 2.00p.m., with an Official Opening at 2.15p.m. and then the fun begins.  It is not just the adults who enjoy the magnificent displays of Flowers, Fruit and Vegetables – the Juvenile Section will provide much fun and interest for young and old alike.    Each year this wonderful Show grows and develops and this year will be no exception.   A fun dog show, children’s entertainment, together with a selection of stalls and games always ensure children and adult’s alike have a happy, busy afternoon.  Once again Eyemouth Pipe Band will be in attendance, providing a wonderful selection of music whilst you enjoy a leisurely stroll around the varied stalls, or sit peacefully in the sun.  The Fun Dog Show always provides much mirth and merriment and the entire day is a great occasion for the whole family – a great get together.  Chris Wish, childrens’ entertainer will be on hand to keep us all amused.   It is to be hoped that a warm afternoon will encourage people to the refreshment tent but even if it is a little cooler a warming cup of tea accompanied by some of the   delicious scones and cakes supplied are a must.  Just in case this doesn’t fill the gap, don’t forget to visit the wealth of different stalls and purchase some of that wonderful home-baking and bric-a-brac. Here’s hoping for a wonderful day both for exhibitors and those visiting. Sponsorship is vital and Innerwick Horticultural Society expresses their gratitude and thanks to all who provide sponsorship, British Energy, Community Windpower, Thurston Holiday Home Park, Viridor and all the many individuals who kindly donate and participate in ensuring Innerwick Flower Show is enjoyed by us all.

Saturday, 6 August is the date to remember!

– it is a great family day out and one you will all enjoy.  Official Opening 2.15p.m.

 

For further information, contact:        Pauline Jaffray (Tel/Fax:   01368 863593)

Minutes of Meeting, 20 June 2011 — 2011-07-08

MINUTES OF MEETING OF
EAST LAMMERMUIR COMMUNITY COUNCIL
HELD ON TUESDAY 28 JUNE 2011
IN OLDHAMSTOCKS VILLAGE HALL

Present : Cllrs C Bruce (Chair), J Hanvidge/P Armstong/P Swain/M Ramsay

In Attendance: PC Tait/ 11 members of the public Cllrs Bell & Mclennan

Apologies: Cllrs B Wyllie/D Charlton /P Jaffray

Chair Chris Bruce welcomed all and explained the form these meetings usually follow. As the majority of the public were here to discuss the proposed Hoprigsheils turbines this would be dealt with first, followed by the suggestions of the use of Crystal Rig monies.

An application was sent to Borders Council on the 26 June, for the erection of three turbines. These turbines are to be the biggest erected. Although the turbines would be erected on Borders Council land, they will be seen from Oldhamstocks, hence East Lammermuir Council’s interest. Cllr Bruce had emailed a survey of specific questions to residents of Oldhamstocks. This survey showed that opinions were neither for nor against. A member of the public present asked if residents and public had all the facts re the benefits of Turbines. After much discussion the public representing Oldhamstocks felt that a questionnaire should be sent out to a wider area, and perhaps obtain a more positive response. As this would take some co-ordinating and residents were of the opinion it should be a member of the council who does this, Cllrs Bruce and Hanvidge agreed to do, with the help of residents present. Cllr Bruce informed those present, that East Lammermuir Council would write to Borders Council with the results of survey, but stressed that individuals should also write with their objections. A public meeting is to be held on Tuesday 5 July at 7.00pm in village hall.

There were a number of proposals for the way in which the substantial increase of money from Crystal Rig should be used. The feeling of the meeting was that it should not be used lightly. As the committee has not had the opportunity to discuss all the implications of handling such a large amount, all ideas were noted and will be looked at. We need to draw up proposals and inform Crystal Rig of our intentions. Cllr Swain represents ELCC on the Sustaining Dunbar committee. It was proposed that someone from BeGreen come and talk to committee.

Police Business: PC Tait submitted the following written report.

Crime in the area continues to be very low since the last community council meeting, with no crimes recorded in the East Lammermuir area.

As discussed previously, we have been trying to pay particular attention to the A1 and its associated junctions, an area that I know is of concern to the members.
As such, a vehicle being driven with no insurance was caught. The driver has been charged and a report has been submitted to the procurator fiscal.

We have also continued to issue fixed penalties for drivers using their mobile phones on the A1. I have noticed a marked decrease in the number of heavy goods vehicle drivers committing this offence, which is encouraging.

One of the topics discussed previously was speeding in the villages, particularly Innerwick. The village is now part of a list, which our Community Action Team focus on, in terms of speed checks.

Given that speeding is such a concern, I am happy to say that I have now been trained in the use of a hand held laser speeding device. This allows me to regularly carry out speeding checks in areas of concern at short notice, where hitherto we had to rely on a long process taking several weeks to arrange speed checks.

With this in mind, I would encourage members to pass on any areas of concern where they feel speeding is an issue. I will then arrange to attend as soon as possible and carry out speed checks. No doubt this will be a welcome and well-used resource!

As mentioned, I previously liaised with Viridor regarding the reports of issues with their vehicles vis-à-vis the A1; the management assured me that they have spoken to their drivers regarding this issue and I have underlined their responsibilities and potential consequences. The relevant manager carried out an operations meeting specifically regarding the issue and created an ongoing incident report. As part of this, all the Viridor drivers were warned. Certainly on the part of the company they were very keen to assist and tackle the problem. I’m pleased to say I have not received any reports regarding further incidents.

This is something that will be ‘visited’ regularly and I will keep a watching brief over.
Again, I would ask if members are aware of any issues they notify me as soon as possible, preferably with the registration number of any vehicle(s) involved.
This information was also been passed on to the Cockburnspath Community Council as requested.

One of the matters that comes to our attention at this time of the year particularly, is the issue of mud on the road from agricultural vehicles. With regard to the law, the legislation covering this has changed.

The relevant legislation is:

Roads (Scotland) Act 1984
Section 95 – Deposit Of Mud From Vehicles On Roads
“(1) A person who, being in charge of a vehicle on a road, allows such quantity of mud, clay, farmyard manure, or other material (of whatever nature) from the vehicle, or from anything carried on the vehicle, to drop onto or be deposited on the road so as to create, or be likely to create, a danger or substantial inconvenience to road users and who fails to remove the material as soon as reasonably practicable commits an offence.”
If you see anything that would be relevant to this, please report it and we can make sure it’s removed before an accident occurs.

I have received an anonymous letter regarding parking issues in Innerwick. The letter refers to concerns over the parking of two vans on the bend next to the church. I have attended there and, unfortunately, there are no powers to have the vans removed, as there is no legislation covering parking at that area.

Unless the vans are parked in an overtly dangerous manner, or were obstructing the roadway, there is little that I can do. Ultimately, if the vehicles are taxed and insured, which they are, they are entitled to park on the road.

Lastly, I would ask that homeowners make sure that any outside fuel containers are securely locked. The country as a whole is experiencing an increase in the theft of fuel, and rural villages are particularly at risk. Please remember that I can also offer free crime prevention surveys for any member of the area.

If there are any questions or issues, please do not hesitate to contact me.

Cll Swain had issues for the Police, brought from Innerwick Parish Welfare Association meeting:

1 Concerns were given over the speeding of First Bus – suggest that drivers of buses drive to road conditions.
2 Dog fouling: tickets have been issued but was still of concern. PC Tait will look into both problems.

Approval of minutes from last meeting held May 10 2011: The minutes were approved

Matters arising:

Paragraph 4: Cllr Bruce had attended the enquiry today and a statement had been submitted. They had asked for witnesses and Neil Reynolds, Oldhamstock resident has submitted a written statement. The enquiry continues.

Treasurer’s Report:

A balance of £1838.39 was given.

Cllrs Reports :

Innerwick : Concerns re wall on Main St.  Owner’s responsibility – Cllrs Bell/McLennan will look into.
Perrymans and First Bus both running a service.

Oldhamstocks:
‘30’ signage done
A hedge on a corner of the Oldhamstocks to Innerwick road needs cutting – Cll Mclennan

Spott:
Pot holes required attending to

Stenton:
Belton Livery warning signs have been done
The old information board –done
Village hall has now been fitted with photo-voltaic cells and the hall is generating electricity.

Cllr Mclennan reported attempts to set up Village Hall Federation and that a meeting would take place on 16 August.

Liaison committees:
Cllrs Swain and Wyllie to attend Lafarge meetings Cllr Bruce will attend Torness Cllr Charlton will continue Viridor Cllr Armstong will continue CAP meetings

Correspondence:

David Small from CHP – ‘Looking at the future of Belhaven Hospital
Transport Strategy – Cllr Armstrong will look at
Maps of Dunbar & East Linton were available from Sustaining Dunbar

Newsletter:
There had been positive feedback from the first edition. Cllr Bruce thanked Cllr Swain for his sterling work. Any ideas for future could be emailed to Cllr Swain.

Dates of future meetings

Tuesday 30 August – Innerwick
Wednesday 12 October – Stenton
Tuesday 29 November – Spott

Concerns over proposed windfarm — 2011-07-06

At the recent meeting of the Community Council in Oldhamstocks eleven members of the public attended. Many were from Oldhamstocks and neighbouring areas and were very concerned about the expected impact of a proposed new wind farm just over the county boundary at Hoprigshiels.
Community Council chairman, Chris Bruce, had arranged a limited opinion survey of local people, by email, but the results from this fairly small sample were rather inconclusive.
A number of local residents agreed to assist in holding a much more comprehensive local survey, and we’ll report the results of this in due course in a future edition of our newsletter and on this web site.

Keep those ideas coming ! — 2011-06-27

We issued with the last Community Council newsletter an appeal for suggestions for projects that might be supported by funds that we are expecting to receive from the operators of the Crystal Rig windfarm.

A number of ideas have been received already and will be considered at the meeting of the Council to be held on Tuesday evening, 28 June in Oldhamstocks Village Hall at 7.30 pm.

However, if anyone has ideas for local projects we would like to hear from them. We are likely to have quite a considerable sum of money to allocate, and the more ideas we receive the better.

Rural Direct — 2011-06-14
An organisation called Rural Direct provides a service designed to help rural community organisations access funding from a range of sources, including the new Scotland Rural Development Programme (SRDP).  Rural Direct is a national service delivered locally by the Scottish Council for Voluntary Organisations (SCVO), and they have been contracted by the Scottish Government to provide a service to local community groups to help them identify sources of funding and to give them advice on making applications to appropriate funders.  The publicity material specifically mentions village halls and so this may be a useful new source of funding for village hall projects in our area. Whether you’re looking to refurbish your village hall, develop new local amenities and services, or work out a long term plan for your community’s future development, funding is available to help you.  Rural Direct can help you get hold of it.  The service is free to constituted groups in rural areas of Scotland.  Anyone wishing to have further information should contact:-

info@ruraldirect.org.uk

or

eastlammermuircommunitycouncil@yahoo.com

Improved Edinburgh – Berwick-Upon-Tweed Bus Service — 2011-06-01

(Of interest mainly to residents of Innerwick and Thurston).

Starting on Monday 30 May, First Group introduced a two-hourly bus service between Edinburgh and Berwick-Upon-Tweed, following the 253 route already operated – also two-hourly – by Perrymans.  The two timetables combine to provide an hourly service on this route.  Timetables for the new service are available on the First Bus web site, and copies have been posted by the community council on the noticeboard outside Innerwick Village Hall and in the bus shelters in Main Street and at the entrance to Thurston Manor caravan park.

BeGreen — 2011-05-27

The BeGreen organisation – part of Sustaining Dunbar, with an office in West Port – is being formed into a community interest company that will oversee the allocation of funding from the Aikengall Wind Farm to local projects.

I have been nominated by the Community Council to represent the Council on the board of this new company.  Through the web site and this blog I shall try to keep local people informed about how the new company and its activities develop and shall also, from time to time and by the same means, encourage local residents to put forward ideas and suggestions for local projects that might be eligible for assistance from funding that the Community Council receives from Fred Olsen Renewables, the operators of the Crystal Rig windfarms.

Up and running ! — 2011-05-26

We have recently produced the first issue of our new Community Council newsletter, which is in the process of being distributed around the ‘patch’.

This is being printed locally in Dunbar, and the cost of printing is covered by funding from the operators of the Crystal Rig windfarm.

Together with our new website, this is part of renewed attempts by the Community Council to improve communications between the Council and local residents.  East Lothian Council’s “Scheme for Community Councils” puts an obligation on each Community Council to “ascertain, co-ordinate and express to the local authority for its area, and to other public authorities, the views of the community that it represents, in relation to matters for which those authorities are responsible and to take such action in the interests of that community as appears to it to be expedient and practicable”.

It is hoped that, through these two new initiatives, we will be able better to discharge that obligation.

Spott Fete — 2011-05-25

No additional text was published with this record.

Innerwick Flower Show — 2011-05-25

No additional text was published with this record.

Oldhamstocks Flower Show — 2011-05-25

More information to follow.

Stenton Flower Show — 2011-05-25

More information about this event in due course.

Minutes of May 2011 Meeting — 2011-05-25

Minutes of  meeting of East Lammermuir Community Council held on Tuesday 10 May 2011 In Innerwick Village Hall

Present: Cllrs C Bruce (Chair)/J Hanvidge/P Armstrong/M Mylne/D Charlton/         P Swain/B Wyllie/M Ramsay

In attendance: Cllrs J Bell/P Mclennan/N Hampshire/K Tulloch (Co-path Comm. Council/ two PCs from Torness Security/two representatives from Mainstream Renewable Power Apologies: P Jaffray The two officers from Torness Security had nothing to report. They were asked if security was to be heightened with the death of Bin Laden. We were informed that security at Torness was always on full alert. Having no other business they were thanked and left the meeting. Chair Chris Bruce welcomed everyone to the meeting and thanked representatives from Mainstream Renewable Power, who had held an open exhibition in the village hall that day on the proposed offshore wind farm. Cllr McLennan has a meeting with Mainstream Renewables on Wednesday 11 May and will keep us informed of future developments.  (At this point the two representatives left the meeting). This evening’s meeting was largely taken up with discussion on all the proposed wind farms within the catchment of East Lammermuir. Various groups were asking the Council for representatives for their groups. Cllr Bruce has invited them to come to our meetings with their reports, but as yet has received no response. It was reported that the proposal for The Neuk has been refused.  Berwickshire Housing Association has carried out a survey of 210 households within 10km of proposed farm. The consensus was in favour of proposal. Aikengall II enquiry – The reporter needs to be informed by Thursday if we wish to make representation. Cllr Bruce will write and hopes to be able to attend. Cllr Hanvidge has received a letter from Fred Olson (Crystal Rig) informing that £82,000 will be available to ELCC. Discussion followed and questions asked, if we are the right people to be handling such large sums of money. After discussion Cllr Bruce will write a short article for Newsletter and get feed back from various Community Associations.  Cllr Mclennan intimated that help and advice would be available from Council. Cllr Swain reported that the web site is now available and the first newsletter is almost ready for printing.  Lothian Printers had provided a good price for printing.  Councillors will distribute around their villages.  Thanks were given to Peter Swain for his hard work and expertise in the production of web site and newsletter. Anyone wishing to contact the council or their individual councillor can do so by emailing, eastlammemuircouncil@yahoo.com At this point the agenda of the meeting was taken up. 2:00 Approval of Minutes of Meeting held on 2 March, 2011. Minutes were approved with the following amendments: Item 6: Para 3 to read ‘Cllr Charlton agreed to advertise the current vacant position within Innerwick’ Item 8: ‘Bus users’ amendment of spelling A letter had been addressed to Cllr Charlton from a resident at Crowhill complaining that the request for a bus shelter had been refused. Letter given to Cllr Mclennan. 3.00  Any other business to be added to the Agenda – None 4:00  Police Business : no report 5:00  Treasurer’s Report:  Balance £1,860.99 Applications for the Crystal Rig funding had been distributed and it was suggested that a separate meeting be held in the next two weeks. 6:00   Matters arising: Peter Swain co-opted to fill vacant position. 7:00  Councillors’ reports: Stenton:  Work on the village green erosion has been attended to Work in progress to rectify flooding Gala Day 29 May Spott:       Road from Spott roundabout into village is awful There are no advance warning signs for pedestrian crossing at Spott roundabout Spott Fete 23 July Innerwick:   Request for wheelie bin in Church yard Innerwick Flower Show – 6 August Oldhamstocks:   Drainage work started – there was no advance notice of work starting. Village now has no public transport First Bus – running Cllr McLennan given timetable this morning North First Bus – running, Cllr McLennan been given timetable that morning. North West Quarry is filling up fast. Ongoing meetings with RSPB.  To be asked to come and talk. As time was now late, the Action list was not touched on. 9:00          Date of next meeting:  22 June, 2011 in Stenton
June 2011 meeting of ELCC – Oldhamstocks — 2011-05-03

The June 2011 meeting of the Community Council has had to be re-scheduled, and will now be held on Tuesday, 28th in Oldhamstocks Village Hall commencing at 7.30 pm.

Welcome to our new website — 2011-04-17

This page last updated 04-05-2011

Here, in updates, you’ll find all our regular news including the minutes of meetings and announcements of each meeting, including the time and venue.

If you have some local news or an announcement, you can get in touch at eastlammermuircommunitycouncil@yahoo.com.
Meeting Minutes 2 March 2011 — 2011-04-15

Minutes of the meeting held on Wednesday 2 March 2011 in Spott Village Hall

Present: Cllrs P Armstrong/M Mylne/D Charlton/C Bruce (Chair) In attendance: PC Cameron Tait/Peter Swain/Cllr J Bell/Pauline Jaffray 1:00 Apologies: Cllrs J Hanvidge/M Ramsay/B Wylie/P McLennan Chair, Chris Bruce, welcomed everyone to the meeting and introduced Mr Peter Swain who is interested in representing Innerwick on East Lammermuir Community Council. A notice advertising the vacancy will be issued and displayed in Innerwick. 2:00 Approval of Minutes of Meeting held on 18 January, 2011. The minutes were approved. 3:00 Any other business to be added to the agenda: None 4:00 Police Business: PC Cameron Tait (shoulder number 5387) introduced himself and provided background information. He had been working in North Berwick and was delighted now to be based in Dunbar and the community policeman responsible for East Lammermuir Community Council area. No crimes have been reported during the last four weeks. However, PC Tait was aware of the concerns regarding the A! Expressway and during the last two weeks an increased patrol has been in operation between Thistly Cross and Cockburnspath. A number of heavy goods vehicle drivers have been charged with driving whilst using mobile telephones. If any member of the public sees anyone driving using a mobile phone, please record the vehicle registration and advise the police. ASBO warnings can now be issued for a period of twelve months. Two reports against the same car registration can result in the car being removed from the owner. Cllr Bruce asked PC Tait to liaise/advise Cockburnspath Community Council (CCC) of items regarding the A1 expressway, as they have a number of issues that need to be addressed. Cllr Bruce would forward recent CCC email to PC Tait. The police are also raising awareness of the dangerous junction at Lafarge with the relevant bodies. Mobile police patrols in the ELCC villages will be increased and Innerwick have noticed an increase in speeding, especially during the period of the Oldhamstocks diversion being in place. Cllr Charlton again asked if the mobile speeding signs could be put in place in Innerwick. Complaints about dangerous parking in Innerwick have been reported and PC Tait would look into this and advise the owners to find a more suitable parking area. 5:00 Treasurer’s Report Balance at 2 March, 2011 – £2,606.39 Pauline Jaffray reported that Cllr Hanvidge was still waiting to hear from Crystal Rig the amount of allotted funds for the coming year. Cllr Armstrong was anxious about the delay, as many of the local fêtes, etc. now relied heavily on this financial support and some events may not take place unless they knew funding was forthcoming. PJ asked all councillors to forward contacts details for all village organisations and would liaise with Cllr Hanvidge to distribute the information as soon as it was available. PJ reiterated that Cllr Hanvidge has been in touch with Crystal Rig on numerous occasions but as yet had not received a response. 6:00 Matters Arising (Previous) The rôle of Secretary for ELCC needed to be discussed and the vacancy filled. As of 2 March, no one from ELCC has volunteered to undertake this position. The item to be kept on the agenda. Cllr Charlton had raised awareness of the access road at North Lodge to Thurston Manor being regularly used. It had now been blocked off using large logs. This was not appropriate as the access is an emergency access and needs to be accessible at all times. Keeping the gate closed was sufficient. Cllr Charlton to contact Mr George Hope, manager at Thurston Manor. Mr Peter Swain is willing to produce an ELCC newsletter provided he has the help and support of all East Lammermuir Community Councillors. He would also welcome ideas and suggestions. Cllr Bruce proposed ELCC co-opt Mr Swain on to ELCC, which was seconded by Cllr Milne. 7:00 Councillors’ Reports Planning applications: Cllr Charlton advised that planning permission was being sought for solar PV panels in a private house in Stenton; alterations to a building in Hunter Steading; erection of a conservatory at Little Pinkerton. Lafarge is seeking planning permission for the erection of a rail loading canopy and formation of hard standing area. Crowhill would like a bus shelter. Cllr Charlton explained ELC had carried out a site visit and their report concluded there was not a suitable site. Residents of Crowhill are disappointed. Speeding in Innerwick is still of concern and Cllr Charlton requested the mobile speed signs. PC Tait would look into this. Cllr Bruce advised it was interesting to note at the recent Lafarge liaison meeting there had been a total of seven out of nine breeches of emissions during December, 2010. Repairs were carried out in January 2011. 8:00 Correspondence Scotland’s Census information. Bus Users meeting to be held at Hallhill on 3 March, 2011 from 7pm – 9pm. Civic Pride Funds.